EPDM According To Site Classification

Spraying compound running track

Type:Spraying compound
Thickness: 13mm
Basement: Asphalt; Cement
Lifetime: over 8 years


 
 

Spraying compound running track is imported from abroad advanced technology, through specialization, has become popular in our country school track and field stadium
Type:Spraying compound
Color: Red, Green, Blue
Thickness:13mm
Basement: Asphalt; Cement
Lifetime: over 8 years

APPLICATION RANGE:

Suitable for formal athletics, general competitive game;Suitable for all kinds of school field and region( with Climate conditions in minus 16 degrees Celsius above), but not for cold ice region.

Character:

1. Chemical stability
EPDM granules could be used for kinds of difficult weather condition, with chemical stability, ozone aging and thermal oxidative aging character.
2. Good elastic
EPDM granules could keep the good elastic even under the condition of low temperature.
Construction technique
3. Vivid colors
All pigment materials which used for our epdm granules are imported from famous company, colors of epdm granules could keep long time, with strong grey scale and uv stability.
4. Good cohession
With many times of experiments and testing, our epdm granules could be mixed with pu binder totally with good cohession.


Construction technique

1. Base Binder
Clean the ground, and brush the glue at the cement ground .
2. Flexible level installation points
Mix the binder with black granules by standard proportion, and mix the materials totally by mix machine.Install the rubber floor by paving machine, keep the thickness around 8-9mm thick. All these work should be done before the base binder cured.

When finished the installation of paving machine, keep the rubber floor away from the damage. About 24 hours later, when it cured, the flexible level of rubber floor is finished.

3. EPDM level installation points

Mix the binder with colored EPDM granules by standard proportion, and mix the materials totally by mix machine. Install the rubber floor by spraying machine. When finished the installation of spraying machine, keep the rubber floor away from the damage. About 24 hours later, when it cured, the EPDM sparing level is finished.